QR Codes / Verification Result

ACENA ERASSA
QR Code Verification
Warning

Please verify the product through additional means. Details:

Scan Limit Exceeded

This product has been verified 18 times (maximum expected: 1)

Geographic Spread Warning

Verified in 12 different cities (maximum expected: 3)

Lebih dri rules, pesan sendiri
Report Suspicious Activity
QR Code Information
ID: 1ACE-TR-61157019
Name:
C-Trace: tuhb
Created:
December 17, 2025, 2:25 PM (America/New_York)
Type:
ctrace
Generated By:
Fabreagas RisasallaVerified Business
Institution:
ACENA ERASSA
QR Code
Verification Details
Cryptographic Verification
  • Token generation: HKDF-SHA256 (256-bit)
  • Signature: HMAC-SHA256 (256-bit)
  • QR data encryption: AES-256-GCM (NIST SP 800-38D)
Scan #18 | Last: Jan 23, 7:33 AM
Cities: 13 | Devices: 2
Verification Status
  • Authentication: Successful
  • Token Verification: Passed
  • Verification Time: January 28, 2026, 3:01 AM
  • Origin: Direct Access
Verification Fingerprint:
$ 2922-B41C-B157-F64C
Batch Name: tuhb
Batch Number: CTR-20251217-7E4360BB
Product Type: ivv
Batch Size: 55 kg
Status: Draft
Created: Dec 17, 2025 19:25
Description

hh

Workflow Steps
  • Step 1: Formulation & Material Preparation
    Pending Cosmetic Formulator

    Recipe development and raw material sourcing

    Instructions:

    Develop or verify formula. Source high-quality ingredients. Test ingredient purity and identity. Verify certificates of analysis from suppliers.

  • Step 2: Weighing & Mixing Preparation
    Pending Production Technician

    Weigh exact ingredient amounts

    Instructions:

    Weigh each ingredient according to formula. Use calibrated scales. Double-check measurements. Prepare ingredients in order of mixing sequence.

  • Step 3: Mixing & Processing
    Pending Processing Operator

    Mixing, homogenization, heating/cooling, filtration

    Instructions:

    Blend water phase and oil phase separately. Combine phases with homogenization. Heat or cool as per formula requirements. Filter if needed. Monitor pH and viscosity continuously.

  • Step 4: Quality & Stability Testing
    Pending QC Lab Technician

    Comprehensive quality and stability testing

    Instructions:

    Conduct stability tests (heat/cool cycles). Test pH, viscosity, color, odor. Perform microbial testing. Document all results. Ensure compliance with standards.

  • Step 5: Filling & Packaging
    Pending Packaging Operator

    Fill into containers, label, and package

    Instructions:

    Fill product into jars, tubes, bottles, or pumps. Ensure accurate fill volumes. Apply labels with all regulatory information. Include batch code and expiry date.

  • Step 6: Final Inspection & Release
    Pending Quality Manager

    Final QC and approval for distribution

    Instructions:

    Perform final inspection of packaged products. Verify documentation completeness. Check storage conditions. Approve batch for release to distribution.

Attachments

No attachments available for this QR code.